The Sulu 1st Engineering District Engineers and staff together with District Engineer Abdulmunir Hadjirul (right) |
DPWH Secretary Mustapha "Don" Loong urging all district engineers of the region to give an update and factual reports regarding the projects implementations within their area of jurisdiction.
The 27th Outbound Staff meeting or year "reports" of every engineering districts regarding the accomplished or non-accomplished projects within this year.
The most hot issue during the meeting, are those multi -billion circumferential roads projects in Basulta area where in the projects are all on going as of today while the Senior High School buildings and other projects, includes the: ports, water systems, mosque, barangay hall and among others are almost finished by different districts region wide.
Engineer Abulmunir I. Hadjirul of Sulu 1st enginering districts reported that his projects are almost done included the circumferential roads in Mainbung and Parang connectiong the 2nd Engineering District of Sulu under District Engineer Arbison.
Engr. Ajan Ajijul of Sulu 1st engineering District together with Two (2) engineers of the same district atttended the 27th Outbound Staff meeting in Alnor,Cotabato. |
The Outbound meeting was very successful because all districts was very cooperative and they are all focus on helping the people in order to uplift the living condition of the people here as one of the mandate of the President of the Republic Rodrigo R. Duterte through the ARMM Governor Mujiv Hataman in order to reduce the poverty line of the country.(By: Becky de Asis)
No comments:
Post a Comment